Crossraods_4

Crossroads Baptist 2019

Posted on | Integration

MABE is proud to partner with Crossroads Baptist building projects. We began phase one of this project by moving all their current AVL system to their Gym so they would have a space to hold services while construction was being completed on the new lobby and sanctuary. We installed a Worx Audio speaker system as well as a PT-RZ970LWU 10k Panasonic projection system. We then added Chauvet Fresnels to add a stage wash. The first Sunday in the Gym went smoothly and that transitioned us into phase two.

Phase two: MABE installed a complete AVL system in the Sanctuary. We installed RCF HDL6 line array speaker system to cover room. MABE also installed a 10k Panasonic projector along with a Black Magic video suite and three Panasonic PTZ camera systems. For lighting, MABE added Chauvet Ovation LED stage lighting along with Chauvet color dash Pars. We went with ADJ COB cannons for house LED fixtures. We put in house lighting and control with Vista FX console and interactive technology wall controls.

Phase three: MABE installed AVL in a brand-new lobby that Crossroads added to their campus. We used Chroma-Q RGBW fixture for house lighting and Elation LED tape for accent lighting controlled by interactive technology wall control. The Cue Station family of button stations are attractive and customizable. They are perfect for use in projects that require a small panel of buttons that can control automated lighting, audio, or show playback. We also installed video distribution for multiple TVs and an audio system with two community ENT212 column array speakers.

MABE is excited to complete this project with Crossroads Baptist and spend time training and being a part of this ministry!

      

Latest Projects

Stay Up-To-Date

Let us help with your next project

Our trusted, dedicated team is devoted to exceeding your needs with our broad array of industry experience designing, producing, and integrating audio and video solutions.

Scroll to Top